Autoclave SOP: A Standard Operating Procedure You Can Adapt
An SOP turns the manual and your infection-control policy into the steps your staff actually follow. Use this structure, fill in your own machine and people, and have it approved before use.
What the SOP should contain
Keep it short enough to follow and specific enough to audit. Name your machine, your cycles and your people — a generic SOP copied from elsewhere is one of the first things an auditor notices.
| Heading | What to write |
|---|---|
| 1. Purpose | To make sure every load released from the steriliser went through a cycle that met its set parameters, and that this is recorded. |
| 2. Scope | Which steriliser (make, model, serial number), which room, which loads — and which loads it must not be used for. |
| 3. Responsibilities | Who may operate it, who releases loads, who runs and reads the tests, who calls the engineer and who reviews the SOP. |
| 4. References | The manufacturer’s instructions for use, your infection-control policy and the standard the machine is declared to, such as EN 13060. |
| 5. Equipment and materials | Water specification, pouches, indicators, test packs, spore tests, and the log book or software. |
| 6. Procedure | Start of day, each load and end of day — the steps below. |
| 7. Release criteria | What must be true before a load is used or stored. |
| 8. Failures | What to do when a test, cycle or load fails, including recall. |
| 9. Records | What is recorded, where, and for how long. |
| 10. Review | When the SOP is reviewed, and who signs it. |
Procedure: start and end of day
- Check the door seal and chamber rim, and wipe them with a damp lint-free cloth.
- Check the clean-water reservoir level and that the used-water tank is empty.
- Switch on and let the machine reach its ready state.
- Run the vacuum leak test if the manual calls for it at the start of the day.
- Run the Bowie-Dick or helix test in an otherwise empty chamber (vacuum sterilisers).
- Record and initial the results. Process no patient loads until both have passed.
- At the end of the day, empty the used-water tank, take out the trays and leave the chamber to dry as the manual directs.
Read next Cleaning schedule to attach to the SOP
Procedure: each load
Prepare
Only clean, dry, inspected instruments go in. Pack them in pouches or wraps as the load requires, with an internal indicator where your policy specifies. Label each pack with the date, the cycle or load number and the contents.
Load
Follow the loading pattern set for each load type: a single layer, pouches on edge or as the manual shows, nothing touching the chamber walls and weight within the cycle’s limit.
Select and run
Choose the cycle the SOP names for that load — for example 134 °C for wrapped instruments and 121 °C for heat-sensitive items. Do not interrupt the cycle or open the door early.
Check and release
Compare the printout or display with the release criteria. Check that each pack is dry and intact and its indicator has changed. Release it, or quarantine and reprocess.
Read next Loading patternsPouches and indicators
Release criteria
Write these as a checklist the operator completes for every load. If any line fails, the load is not released.
| Check | Pass |
|---|---|
| Cycle record | Temperature, pressure and hold time within the cycle’s limits; no alarms |
| Process indicators | Fully changed on every pack |
| Internal indicators | Passed in the packs where the SOP places them |
| Packs | Dry, sealed, undamaged and labelled |
| Daily tests | Today’s air-removal and leak tests passed |
| Spore test | No positive result outstanding for this steriliser |
Failures, records and review
- Failed test: stop patient loads and repeat once. If it fails again, take the machine out of use and call the engineer.
- Failed load: quarantine it, reprocess it once the cause is fixed, and record what happened.
- Positive spore test: stop using the steriliser, recall loads processed since the last negative test as your policy sets, inform the infection-control lead and record the corrective action.
- Records: cycle printouts or logs, test and spore results, the cleaning log and service reports, kept together for the period your policy and licensing require.
- Training: list who has been trained and signed off on the SOP, and retrain after changes.
- Review: at least yearly, and after a new machine, a repair that affects the cycle, a new load type or a failure.
Read next Troubleshooting faultsValidation and requalificationCara guna autoclave (Bahasa Malaysia)
Related guides
Autoclave supply near you
Delivery, installation and training across Malaysia from Batu Caves, Kota Kinabalu and Kuching.
Frequently asked questions
What is an autoclave SOP?
Who should approve an autoclave SOP?
How often should an autoclave SOP be reviewed?
Can I copy another clinic’s autoclave SOP?
Get a written quotation
Tell us your clinic or lab type, daily workload and location. We match suitable models and send a written quotation with delivery, installation and training spelled out.